Probedrill Geotechnical Investigation

Geotechnical Investigation Western Australia, Site Assessment Services, Cone Penetration Testing - Probedrill, Perth, WA Western Australia

+61 8 9417 9933 info@probedrill.com.au
  • News
  • Gallery / Videos
  • Contact Us
Menu
  • Home
  • Geotechnical Services
    • Electric Friction Cone Penetration Testing (EFCP)/(CPT)
    • Piezocone Testing
    • Dissipation Testing
    • Seismic Cone Penetrometer Testing (SCPT)
    • Seismic Cone Penetrometer Testing (Dual Geophone) SCPT
    • Dilatometer Testing (DMT)
    • Seismic DMT (SDMT)
    • Standpipe installation
    • Soil Sampling
    • Piston Sampling
    • Dual Tube Sampling
    • Sediment Sampling
    • Electrical Vane Shear Testing
    • Vibrating Wire Piezometer Installation (VWP)
    • Electronic Plate Load Testing
    • Vacuum Potholing
    • Seabed CPT
    • Ball Penetrometer / T-Bar Penetrometer Testing
    • Water Sampling
    • MIP / ROST Environmental Testing
    • Resistivity / Conductivity Testing
    • Close
  • CPT Rigs
      • 25 Tonne Truck Rig (RFW)
      • 22 Tonne Truck Rig (Merc)
      • 22 Tonne Track-Truck
      • Morooka 3 (M3)
      • Morooka 1 (M1)
      • Morooka 2 (M2)
      • 7 Tonne Track Rig
      • 13 Tonne Marsh Buggy Rig
      • Seabed CPT
      • 300kN Pushing Frame
      • Portable Equipment
      • Portable Platform ***NEW***
      • Container Rig
    • Close
  • Projects
    • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
    • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
    • South Australia: 2016
    • Seabed CPT: Gulf of St Vincent, S.A: 2016
    • Perth Stadium, Burswood: 2012 – 2015
    • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
    • Forrestfield – Airport Link Project, Perth: 2014 – 2015
    • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
    • Browse Phase 3 – James Price Point, Broome: 2012
    • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013
    • Perth – Bunbury Highway Project: 2007
    • Koolan Island: 2002
    • Close
  • Sub Sea Testing
  • Testing Details
    • What is Cone Penetration Testing (CPT)?
    • Methods of Testing
    • Equipment
    • Instrumentation
    • Graphs / Plots
    • Close
  • 25 Tonne Truck Rig (RFW)

    25 Tonne Truck Rig (RFW)

  • 22 Tonne Truck Rig (Merc)

    22 Tonne Truck Rig (Merc)

  • 22 Tonne Track-Truck

    22 Tonne Track-Truck

  • Morooka 3 (M3)

    Morooka 3 (M3)

Home > Projects

Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017

In May-June 2017, Probedrill successfully completed site investigations for the Western Harbour Tunnel & Beaches Link (WHTBL), using our Seabed CPT Pushing Frame. Testing was conducted over five weeks in…

Read More

Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017

In April 2015, we successfully conducted testing with the Marshbuggy Rig in the Swan River using spud leg attachments in order to provide increased stability and anchorage. This was a…

Read More

South Australia: 2016

In August 2016, Probedrill successfully completed testing for Golder Associates at a mine site in South Australia.  This work was competed by our 22 tonne truck mounted CPT Rig (Merc),…

Read More

Seabed CPT: Gulf of St Vincent, S.A: 2016

In April – May 2016, Probedrill successfully completed seabed testing for the international developer Senvion, for the Ceres Project – South Australia, .This Project is one of the largest renewable energy projects in Australia and involves…

Read More

Perth Stadium, Burswood: 2012 – 2015

Probedrill have been involved with various stages of the New Perth Stadium, Burswood.  From the initial design stage and ground improvement investigations through to current construction works including rail reserves, pedestrian bridges and…

Read More

Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015

Elizabeth Quay is a major WA development project in the Perth CBD and involves the construction of an artificial inlet in what was previously the Esplanade.Probedrill have been involved in…

Read More

Forrestfield – Airport Link Project, Perth: 2014 – 2015

Probedrill provided CPT at sites located across High Wycombe, Bayswater, Redcliffe and Perth Airport for the $2billion State Government-funded Forrestfield-Airport Link (FAL Project). The FAL Project is a new train line that…

Read More

Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013

Towards the end of 2013, Probedrill successfully completed the first “floating” CPT using the Marshbuggy rig.Testing was undertaken on a tailings dam in Newcastle where winch, ropes and shore anchors were…

Read More

Browse Phase 3 – James Price Point, Broome: 2012

In 2012, Probedrill provided Geotechnical Testing services for the James Price Point Project, Broome.We used our Portable CPT Pushing frames mounted on three Jack-up Barges and operated 24 hours/day over three months.

Read More

Chevron Wheatstone LNG Project, Onslow: 2009 – 2013

Probedrill has been involved in Phases 2, 3 & 4 of the Chevron Wheatstone LNG Project, Onslow. This is one of the largest resource projects in Australia and includes an LNG…

Read More
  • 1
  • 2
  • Next Page »

Geotechnical Projects

  • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
  • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
  • South Australia: 2016
  • Seabed CPT: Gulf of St Vincent, S.A: 2016
  • Perth Stadium, Burswood: 2012 – 2015
  • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
  • Forrestfield – Airport Link Project, Perth: 2014 – 2015
  • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
  • Browse Phase 3 – James Price Point, Broome: 2012
  • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013
  • Perth – Bunbury Highway Project: 2007
  • Koolan Island: 2002

Probedrill News

  • Inclined CPTDecember 18, 2018
  • Information Flyer – TRUCK Rig UpdatesAugust 10, 2018
  • Information Flyer – September 2017September 28, 2017
  • Updated: 19 tonne tracked rig (M3) now East-Coast basedJanuary 31, 2017
  • Information Flyer – September 2016September 1, 2016
  • Information Flyer – March 2016April 7, 2016
  • Inclination on PlotsDecember 12, 2015
  • Tracked Rig based in Port HedlandDecember 12, 2015
  • Marshbuggy Rig – Spud legsOctober 27, 2015
  • Update on Electronic Plateload TestingAugust 27, 2015
  • GPS of locations now availableMay 3, 2015
  • Probedrill Celebrates 20 YearsApril 3, 2015
  • Improvements to Vibrating Wire InstallationJuly 3, 2014
  • Plate Load TestingJuly 3, 2014
  • Information Flyer: Sediment/Piston Sampling, Vane Shear, “Floating” CPTJanuary 3, 2014

Latest Projects

  • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
  • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
  • South Australia: 2016
  • Seabed CPT: Gulf of St Vincent, S.A: 2016
  • Perth Stadium, Burswood: 2012 – 2015
  • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
  • Forrestfield – Airport Link Project, Perth: 2014 – 2015
  • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
  • Browse Phase 3 – James Price Point, Broome: 2012
  • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013

Keep up to date with our Geotechnical Equipment and Services over on SALTKICK

20_years

Probedrill is a member of the:
Australian Geomechanics Society

Get in touch…

Probedrill Office / Workshop

08 9417 9933 info@probedrill.com.au
Download TeamViewer Download TeamViewer
Probedrill Geotechnical Investigation © Copyright 2021 | site by digiflip