Probedrill Geotechnical Investigation

Geotechnical Investigation Western Australia, Site Assessment Services, Cone Penetration Testing - Probedrill, Perth, WA Western Australia

+61 8 9417 9933 info@probedrill.com.au
  • News
  • Gallery / Videos
  • Contact Us
Menu
  • Home
  • Geotechnical Services
    • Electric Friction Cone Penetration Testing (EFCP)/(CPT)
    • Piezocone Testing
    • Dissipation Testing
    • Seismic Cone Penetrometer Testing (SCPT)
    • Seismic Cone Penetrometer Testing (Dual Geophone) SCPT
    • Dilatometer Testing (DMT)
    • Seismic DMT (SDMT)
    • Standpipe installation
    • Soil Sampling
    • Piston Sampling
    • Dual Tube Sampling
    • Sediment Sampling
    • Electrical Vane Shear Testing
    • Vibrating Wire Piezometer Installation (VWP)
    • Electronic Plate Load Testing
    • Vacuum Potholing
    • Seabed CPT
    • Ball Penetrometer / T-Bar Penetrometer Testing
    • Water Sampling
    • MIP / ROST Environmental Testing
    • Resistivity / Conductivity Testing
    • Close
  • CPT Rigs
      • 25 Tonne Truck Rig (RFW)
      • 22 Tonne Truck Rig (Merc)
      • 22 Tonne Track-Truck
      • Morooka 3 (M3)
      • Morooka 1 (M1)
      • Morooka 2 (M2)
      • 7 Tonne Track Rig
      • 13 Tonne Marsh Buggy Rig
      • Seabed CPT
      • 300kN Pushing Frame
      • Portable Equipment
      • Portable Platform ***NEW***
      • Container Rig
    • Close
  • Projects
    • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
    • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
    • South Australia: 2016
    • Seabed CPT: Gulf of St Vincent, S.A: 2016
    • Perth Stadium, Burswood: 2012 – 2015
    • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
    • Forrestfield – Airport Link Project, Perth: 2014 – 2015
    • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
    • Browse Phase 3 – James Price Point, Broome: 2012
    • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013
    • Perth – Bunbury Highway Project: 2007
    • Koolan Island: 2002
    • Close
  • Sub Sea Testing
  • Testing Details
    • What is Cone Penetration Testing (CPT)?
    • Methods of Testing
    • Equipment
    • Instrumentation
    • Graphs / Plots
    • Close
  • 25 Tonne Truck Rig (RFW)

    25 Tonne Truck Rig (RFW)

  • 22 Tonne Truck Rig (Merc)

    22 Tonne Truck Rig (Merc)

  • 22 Tonne Track-Truck

    22 Tonne Track-Truck

  • Morooka 3 (M3)

    Morooka 3 (M3)

Home > Geotechnical Services > Dual Tube Sampling

Dual Tube Sampling

The DT325 Soil Sampling System (from Geoprobe) uses a combination of cutting shoe, sheath, and liner retainer to allow efficient recovery of samples in formations ranging from plastic clays to saturated sands.

It is designed to quickly recover samples well below the water table, and is ideal for continuous sampling.

The Dual Tube sampler is also suitable for use in:

  • Installing 50mm standpipe
  • Providing casing support for our Piston Sampler
  • Installing pre-pack screen for Environmental Monitoring well.

This service is currently available in our M2, M3, RFW and Marshbuggy CPT rigs.

Geoprobe DT325_SOP - Copy

 


Geotechnical Services

  • Electric Friction Cone Penetration Testing (EFCP)/(CPT)
  • Piezocone Testing
  • Dissipation Testing
  • Seismic Cone Penetrometer Testing (SCPT)
  • Seismic Cone Penetrometer Testing (Dual Geophone) SCPT
  • Dilatometer Testing (DMT)
  • Seismic DMT (SDMT)
  • Standpipe installation
  • Soil Sampling
  • Piston Sampling
  • Dual Tube Sampling
  • Sediment Sampling
  • Electrical Vane Shear Testing
  • Vibrating Wire Piezometer Installation (VWP)
  • Electronic Plate Load Testing
  • Vacuum Potholing
  • Seabed CPT
  • Ball Penetrometer / T-Bar Penetrometer Testing
  • Water Sampling
  • MIP / ROST Environmental Testing
  • Resistivity / Conductivity Testing

Probedrill News

  • Inclined CPTDecember 18, 2018
  • Information Flyer – TRUCK Rig UpdatesAugust 10, 2018
  • Information Flyer – September 2017September 28, 2017
  • Updated: 19 tonne tracked rig (M3) now East-Coast basedJanuary 31, 2017
  • Information Flyer – September 2016September 1, 2016
  • Information Flyer – March 2016April 7, 2016
  • Inclination on PlotsDecember 12, 2015
  • Tracked Rig based in Port HedlandDecember 12, 2015
  • Marshbuggy Rig – Spud legsOctober 27, 2015
  • Update on Electronic Plateload TestingAugust 27, 2015
  • GPS of locations now availableMay 3, 2015
  • Probedrill Celebrates 20 YearsApril 3, 2015
  • Improvements to Vibrating Wire InstallationJuly 3, 2014
  • Plate Load TestingJuly 3, 2014
  • Information Flyer: Sediment/Piston Sampling, Vane Shear, “Floating” CPTJanuary 3, 2014

Latest Projects

  • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
  • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
  • South Australia: 2016
  • Seabed CPT: Gulf of St Vincent, S.A: 2016
  • Perth Stadium, Burswood: 2012 – 2015
  • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
  • Forrestfield – Airport Link Project, Perth: 2014 – 2015
  • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
  • Browse Phase 3 – James Price Point, Broome: 2012
  • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013

Keep up to date with our Geotechnical Equipment and Services over on SALTKICK

20_years

Probedrill is a member of the:
Australian Geomechanics Society

Get in touch…

Probedrill Office / Workshop

08 9417 9933 info@probedrill.com.au
Download TeamViewer Download TeamViewer
Probedrill Geotechnical Investigation © Copyright 2022 | site by digiflip