Probedrill Geotechnical Investigation

Geotechnical Investigation Western Australia, Site Assessment Services, Cone Penetration Testing - Probedrill, Perth, WA Western Australia

+61 8 9417 9933 info@probedrill.com.au
  • News
  • Gallery / Videos
  • Contact Us
Menu
  • Home
  • Geotechnical Services
    • Electric Friction Cone Penetration Testing (EFCP)/(CPT)
    • Piezocone Testing
    • Dissipation Testing
    • Seismic Cone Penetrometer Testing (SCPT)
    • Seismic Cone Penetrometer Testing (Dual Geophone) SCPT
    • Dilatometer Testing (DMT)
    • Seismic DMT (SDMT)
    • Standpipe installation
    • Soil Sampling
    • Piston Sampling
    • Dual Tube Sampling
    • Sediment Sampling
    • Electrical Vane Shear Testing
    • Vibrating Wire Piezometer Installation (VWP)
    • Electronic Plate Load Testing
    • Vacuum Potholing
    • Seabed CPT
    • Ball Penetrometer / T-Bar Penetrometer Testing
    • Water Sampling
    • MIP / ROST Environmental Testing
    • Resistivity / Conductivity Testing
    • Close
  • CPT Rigs
      • Seabed CPT
      • 22 Tonne Truck Rig (Merc)
      • 25 Tonne Truck Rig (RFW)
      • Morooka 1 (M1)
      • Morooka 2 (M2)
      • Morooka 3 (M3)
      • 13 tonne Marsh Buggy Rig
      • 7 tonne Track Rig
      • 22 tonne Track-Truck
      • Portable Equipment
      • 300kN Pushing frame
      • Container Rig
    • Close
  • Projects
    • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
    • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
    • South Australia: 2016
    • Seabed CPT: Gulf of St Vincent, S.A: 2016
    • Perth Stadium, Burswood: 2012 – 2015
    • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
    • Forrestfield – Airport Link Project, Perth: 2014 – 2015
    • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
    • Browse Phase 3 – James Price Point, Broome: 2012
    • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013
    • Perth – Bunbury Highway Project: 2007
    • Koolan Island: 2002
    • Close
  • Sub Sea Testing
  • Testing Details
    • What is Cone Penetration Testing (CPT)?
    • Methods of Testing
    • Equipment
    • Instrumentation
    • Graphs / Plots
    • Close
  • Seabed CPT

    Seabed CPT

  • 22 Tonne Truck Rig (Merc)

    22 Tonne Truck Rig (Merc)

  • 25 Tonne Truck Rig (RFW)

    25 Tonne Truck Rig (RFW)

  • Morooka 1 (M1)

    Morooka 1 (M1)

Home > CPT Rigs > Morooka 3 (M3)

Morooka 3 (M3)

CPT Rig Specifications
Height (while travelling): 3.2m
Height (while probing) 4.4m
Length: 6.0m
Width: 2.5m
Min. Ground Bearing Pressure: 0.39 kg/cm2 (38kPa / 5.5psi)
Travelling Speed (tracked rigs): Low: 7.6km; High: 11km/h
For use in areas such as: Soft / sandy / tidal ground

The M3 is our latest built Morooka.  Being a 19 tonne tracked rig, it has the capabilities of getting into soft, sandy areas while having the pushing capacity (185kN) comparable to that of our truck mounted rigs. The M3 is transported to site via Prime Mover & 10m Drop-deck trailer with ramps Other specifications include :

  • Grade ability 60%
  • Engine Mitsubishi (7545cc) 204HP @ 2,700 rpm
  • Fuel Tank 156 L (Diesel)
  • Drive System HST
  • Tracks 700mm wide rubber tracks
  • Levelling Jacks 1.2m stroke (700mm lift from ground)

EQUIPMENT / FEATURES

  • Winch A.P.E. Winch: Hydraulically Powered 13.6 tonne line pull with 45m of 18mm wire rope.
  • 2.4m x 1.2m Plastic Bog Boards
  • 1 x 9kg ABE Fire extinguisher
  • Air conditioned work cabin and drive cabin
  • ROPS
  • Reversing Camera


NIB Stadium
NIB Stadium
M3 – Mt Keith TSF

M3 – Mt Keith TSF

CPT Rigs

  • Seabed CPT
  • 22 Tonne Truck Rig (Merc)
  • 25 Tonne Truck Rig (RFW)
  • Morooka 1 (M1)
  • Morooka 2 (M2)
  • Morooka 3 (M3)
  • 13 tonne Marsh Buggy Rig
  • 7 tonne Track Rig
  • 22 tonne Track-Truck
  • Portable Equipment
  • 300kN Pushing frame
  • Container Rig
Morooka 3 (M3)
Spec Sheet

Probedrill News

  • Information Flyer – September 2017September 28, 2017
  • Updated: 19 tonne tracked rig (M3) now East-Coast basedJanuary 31, 2017
  • Information Flyer – September 2016September 1, 2016
  • Information Flyer – March 2016April 7, 2016
  • Inclination on PlotsDecember 12, 2015
  • Tracked Rig based in Port HedlandDecember 12, 2015
  • Marshbuggy Rig – Spud legsOctober 27, 2015
  • Update on Electronic Plateload TestingAugust 27, 2015
  • GPS of locations now availableMay 3, 2015
  • Probedrill Celebrates 20 YearsApril 3, 2015
  • Improvements to Vibrating Wire InstallationJuly 3, 2014
  • Plate Load TestingJuly 3, 2014
  • Information Flyer: Sediment/Piston Sampling, Vane Shear, “Floating” CPTJanuary 3, 2014

Latest Projects

  • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
  • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
  • South Australia: 2016
  • Seabed CPT: Gulf of St Vincent, S.A: 2016
  • Perth Stadium, Burswood: 2012 – 2015
  • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
  • Forrestfield – Airport Link Project, Perth: 2014 – 2015
  • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
  • Browse Phase 3 – James Price Point, Broome: 2012
  • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013

20_years

Probedrill is a member of the:
Australian Geomechanics Society

Download TeamViewer Download TeamViewer

Get in touch…

Probedrill Office / Workshop

08 9417 9933 info@probedrill.com.au
Probedrill Geotechnical Investigation © Copyright 2018 | site by digiflip
/* ----------------------------------------- */ /* Content Template: Rigs slider – slide - start */ /* ----------------------------------------- */ /* ----------------------------------------- */ /* Content Template: Rigs slider – slide - end */ /* ----------------------------------------- */ /* ----------------------------------------- */ /* Content Template: CPT Rig Template - start */ /* ----------------------------------------- */ /* ----------------------------------------- */ /* Content Template: CPT Rig Template - end */ /* ----------------------------------------- */