Probedrill Geotechnical Investigation

Geotechnical Investigation Western Australia, Site Assessment Services, Cone Penetration Testing - Probedrill, Perth, WA Western Australia

+61 8 9417 9933 info@probedrill.com.au
  • News
  • Gallery / Videos
  • Contact Us
Menu
  • Home
  • Geotechnical Services
    • Electric Friction Cone Penetration Testing (EFCP)/(CPT)
    • Piezocone Testing
    • Dissipation Testing
    • Seismic Cone Penetrometer Testing (SCPT)
    • Seismic Cone Penetrometer Testing (Dual Geophone) SCPT
    • Dilatometer Testing (DMT)
    • Seismic DMT (SDMT)
    • Standpipe installation
    • Soil Sampling
    • Piston Sampling
    • Dual Tube Sampling
    • Sediment Sampling
    • Electrical Vane Shear Testing
    • Vibrating Wire Piezometer Installation (VWP)
    • Electronic Plate Load Testing
    • Vacuum Potholing
    • Seabed CPT
    • Ball Penetrometer / T-Bar Penetrometer Testing
    • Water Sampling
    • MIP / ROST Environmental Testing
    • Resistivity / Conductivity Testing
    • Close
  • CPT Rigs
      • 25 Tonne Truck Rig (RFW)
      • 22 Tonne Truck Rig (Merc)
      • 22 Tonne Track-Truck
      • Morooka 3 (M3)
      • Morooka 1 (M1)
      • Morooka 2 (M2)
      • 7 Tonne Track Rig
      • 13 Tonne Marsh Buggy Rig
      • Seabed CPT
      • 300kN Pushing Frame
      • Portable Equipment
      • Portable Platform ***NEW***
      • Container Rig
    • Close
  • Projects
    • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
    • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
    • South Australia: 2016
    • Seabed CPT: Gulf of St Vincent, S.A: 2016
    • Perth Stadium, Burswood: 2012 – 2015
    • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
    • Forrestfield – Airport Link Project, Perth: 2014 – 2015
    • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
    • Browse Phase 3 – James Price Point, Broome: 2012
    • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013
    • Perth – Bunbury Highway Project: 2007
    • Koolan Island: 2002
    • Close
  • Sub Sea Testing
  • Testing Details
    • What is Cone Penetration Testing (CPT)?
    • Methods of Testing
    • Equipment
    • Instrumentation
    • Graphs / Plots
    • Close
  • 25 Tonne Truck Rig (RFW)

    25 Tonne Truck Rig (RFW)

  • 22 Tonne Truck Rig (Merc)

    22 Tonne Truck Rig (Merc)

  • 22 Tonne Track-Truck

    22 Tonne Track-Truck

  • Morooka 3 (M3)

    Morooka 3 (M3)

Home > Projects > Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015

Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015

Services rendered for this project
Dilatometer Testing (DMT)
Dissipation Testing
Electric Friction Cone Penetration Testing (EFCP)/(CPT)
Electrical Vane Shear Testing
Piezocone Testing
Seismic Cone Penetrometer Testing (SCPT)
Soil Sampling
Standpipe installation

Elizabeth Quay is a major WA development project in the Perth CBD and involves the construction of an artificial inlet in what was previously the Esplanade.

Probedrill have been involved in various stages of the construction and provided testing using our 13 tonne Marshbuggy Rig in the Swan River, together with land-based testing using our truck and tracked rigs.

The Quay is due to be opened to the public in January 2016 with further residential/commercial construction to take place and be completed by 2018.

Further information on the project can be found at www.elizabethquay.com.au

 

IMG_2133 IMG_2151 DSC_0231 DSC_0242   DSCN0081  DSC_02912010-11-23 12.52.312010-11-23 06.08.40

Geotechnical Projects

  • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
  • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
  • South Australia: 2016
  • Seabed CPT: Gulf of St Vincent, S.A: 2016
  • Perth Stadium, Burswood: 2012 – 2015
  • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
  • Forrestfield – Airport Link Project, Perth: 2014 – 2015
  • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
  • Browse Phase 3 – James Price Point, Broome: 2012
  • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013
  • Perth – Bunbury Highway Project: 2007
  • Koolan Island: 2002

Probedrill News

  • Inclined CPTDecember 18, 2018
  • Information Flyer – TRUCK Rig UpdatesAugust 10, 2018
  • Information Flyer – September 2017September 28, 2017
  • Updated: 19 tonne tracked rig (M3) now East-Coast basedJanuary 31, 2017
  • Information Flyer – September 2016September 1, 2016
  • Information Flyer – March 2016April 7, 2016
  • Inclination on PlotsDecember 12, 2015
  • Tracked Rig based in Port HedlandDecember 12, 2015
  • Marshbuggy Rig – Spud legsOctober 27, 2015
  • Update on Electronic Plateload TestingAugust 27, 2015
  • GPS of locations now availableMay 3, 2015
  • Probedrill Celebrates 20 YearsApril 3, 2015
  • Improvements to Vibrating Wire InstallationJuly 3, 2014
  • Plate Load TestingJuly 3, 2014
  • Information Flyer: Sediment/Piston Sampling, Vane Shear, “Floating” CPTJanuary 3, 2014

Latest Projects

  • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
  • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
  • South Australia: 2016
  • Seabed CPT: Gulf of St Vincent, S.A: 2016
  • Perth Stadium, Burswood: 2012 – 2015
  • Forrestfield – Airport Link Project, Perth: 2014 – 2015
  • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
  • Browse Phase 3 – James Price Point, Broome: 2012
  • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013
  • Perth – Bunbury Highway Project: 2007

Keep up to date with our Geotechnical Equipment and Services over on SALTKICK

20_years

Probedrill is a member of the:
Australian Geomechanics Society

Get in touch…

Probedrill Office / Workshop

08 9417 9933 info@probedrill.com.au
Download TeamViewer Download TeamViewer
Probedrill Geotechnical Investigation © Copyright 2021 | site by digiflip