Probedrill Geotechnical Investigation

Geotechnical Investigation Western Australia, Site Assessment Services, Cone Penetration Testing - Probedrill, Perth, WA Western Australia

+61 8 9417 9933 info@probedrill.com.au
  • News
  • Gallery / Videos
  • Contact Us
Menu
  • Home
  • Geotechnical Services
    • Electric Friction Cone Penetration Testing (EFCP)/(CPT)
    • Piezocone Testing
    • Dissipation Testing
    • Seismic Cone Penetrometer Testing (SCPT)
    • Seismic Cone Penetrometer Testing (Dual Geophone) SCPT
    • Dilatometer Testing (DMT)
    • Seismic DMT (SDMT)
    • Standpipe installation
    • Soil Sampling
    • Piston Sampling
    • Dual Tube Sampling
    • Sediment Sampling
    • Electrical Vane Shear Testing
    • Vibrating Wire Piezometer Installation (VWP)
    • Electronic Plate Load Testing
    • Vacuum Potholing
    • Seabed CPT
    • Ball Penetrometer / T-Bar Penetrometer Testing
    • Water Sampling
    • MIP / ROST Environmental Testing
    • Resistivity / Conductivity Testing
    • Close
  • CPT Rigs
      • 25 Tonne Truck Rig (RFW)
      • 22 Tonne Truck Rig (Merc)
      • 22 Tonne Track-Truck
      • Morooka 3 (M3)
      • Morooka 1 (M1)
      • Morooka 2 (M2)
      • 7 Tonne Track Rig
      • 13 Tonne Marsh Buggy Rig
      • Seabed CPT
      • 300kN Pushing Frame
      • Portable Equipment
      • Portable Platform ***NEW***
      • Container Rig
    • Close
  • Projects
    • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
    • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
    • South Australia: 2016
    • Seabed CPT: Gulf of St Vincent, S.A: 2016
    • Perth Stadium, Burswood: 2012 – 2015
    • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
    • Forrestfield – Airport Link Project, Perth: 2014 – 2015
    • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
    • Browse Phase 3 – James Price Point, Broome: 2012
    • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013
    • Perth – Bunbury Highway Project: 2007
    • Koolan Island: 2002
    • Close
  • Sub Sea Testing
  • Testing Details
    • What is Cone Penetration Testing (CPT)?
    • Methods of Testing
    • Equipment
    • Instrumentation
    • Graphs / Plots
    • Close
  • Morooka 1 (M1)

    Morooka 1 (M1)

  • Morooka 2 (M2)

    Morooka 2 (M2)

  • 7 Tonne Track Rig

    7 Tonne Track Rig

  • 13 Tonne Marsh Buggy Rig

    13 Tonne Marsh Buggy Rig

Home > Geotechnical News > GPS of locations now available

GPS of locations now available

Probedrill now has the ability to provide coordinates for your CPT locations using our Navcom Dual Frequency DGPS System.

GPS of locations now available

GPS of locations now available

Our GPS provides decimeter accuracy and can be used to supply coordinates on our CPT plots. Probedrill is pleased to offer this service for a small fee of $10/location.

We can also mark out the test locations if provided with a co-ordinate list and location map (standby rates will apply).

Please contact the office should you require any further information or wish to take advantage of this service, as notice is required prior to mobilisation.

Probedrill News

  • Inclined CPTDecember 18, 2018
  • Information Flyer – TRUCK Rig UpdatesAugust 10, 2018
  • Information Flyer – September 2017September 28, 2017
  • Updated: 19 tonne tracked rig (M3) now East-Coast basedJanuary 31, 2017
  • Information Flyer – September 2016September 1, 2016
  • Information Flyer – March 2016April 7, 2016
  • Inclination on PlotsDecember 12, 2015
  • Tracked Rig based in Port HedlandDecember 12, 2015
  • Marshbuggy Rig – Spud legsOctober 27, 2015
  • Update on Electronic Plateload TestingAugust 27, 2015
  • Probedrill Celebrates 20 YearsApril 3, 2015
  • Improvements to Vibrating Wire InstallationJuly 3, 2014
  • Plate Load TestingJuly 3, 2014
  • Information Flyer: Sediment/Piston Sampling, Vane Shear, “Floating” CPTJanuary 3, 2014

Latest Projects

  • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
  • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
  • South Australia: 2016
  • Seabed CPT: Gulf of St Vincent, S.A: 2016
  • Perth Stadium, Burswood: 2012 – 2015
  • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
  • Forrestfield – Airport Link Project, Perth: 2014 – 2015
  • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
  • Browse Phase 3 – James Price Point, Broome: 2012
  • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013

Keep up to date with our Geotechnical Equipment and Services over on SALTKICK

20_years

Probedrill is a member of the:
Australian Geomechanics Society

Get in touch…

Probedrill Office / Workshop

08 9417 9933 info@probedrill.com.au
Download TeamViewer Download TeamViewer
Probedrill Geotechnical Investigation © Copyright 2022 | site by digiflip