Probedrill Geotechnical Investigation

Geotechnical Investigation Western Australia, Site Assessment Services, Cone Penetration Testing - Probedrill, Perth, WA Western Australia

+61 8 9417 9933 info@probedrill.com.au
  • News
  • Gallery / Videos
  • Contact Us
Menu
  • Home
  • Geotechnical Services
    • Electric Friction Cone Penetration Testing (EFCP)/(CPT)
    • Piezocone Testing
    • Dissipation Testing
    • Seismic Cone Penetrometer Testing (SCPT)
    • Seismic Cone Penetrometer Testing (Dual Geophone) SCPT
    • Dilatometer Testing (DMT)
    • Seismic DMT (SDMT)
    • Standpipe installation
    • Soil Sampling
    • Piston Sampling
    • Dual Tube Sampling
    • Sediment Sampling
    • Electrical Vane Shear Testing
    • Vibrating Wire Piezometer Installation (VWP)
    • Electronic Plate Load Testing
    • Vacuum Potholing
    • Seabed CPT
    • Ball Penetrometer / T-Bar Penetrometer Testing
    • Water Sampling
    • MIP / ROST Environmental Testing
    • Resistivity / Conductivity Testing
    • Close
  • CPT Rigs
      • 25 Tonne Truck Rig (RFW)
      • 22 Tonne Truck Rig (Merc)
      • 22 Tonne Track-Truck
      • Morooka 3 (M3)
      • Morooka 1 (M1)
      • Morooka 2 (M2)
      • 7 Tonne Track Rig
      • 13 Tonne Marsh Buggy Rig
      • Seabed CPT
      • 300kN Pushing Frame
      • Portable Equipment
      • Portable Platform ***NEW***
      • Container Rig
    • Close
  • Projects
    • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
    • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
    • South Australia: 2016
    • Seabed CPT: Gulf of St Vincent, S.A: 2016
    • Perth Stadium, Burswood: 2012 – 2015
    • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
    • Forrestfield – Airport Link Project, Perth: 2014 – 2015
    • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
    • Browse Phase 3 – James Price Point, Broome: 2012
    • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013
    • Perth – Bunbury Highway Project: 2007
    • Koolan Island: 2002
    • Close
  • Sub Sea Testing
  • Testing Details
    • What is Cone Penetration Testing (CPT)?
    • Methods of Testing
    • Equipment
    • Instrumentation
    • Graphs / Plots
    • Close
  • 25 Tonne Truck Rig (RFW)

    25 Tonne Truck Rig (RFW)

  • 22 Tonne Truck Rig (Merc)

    22 Tonne Truck Rig (Merc)

  • 22 Tonne Track-Truck

    22 Tonne Track-Truck

  • Morooka 3 (M3)

    Morooka 3 (M3)

Home > Geotechnical News > Probedrill Celebrates 20 Years

Probedrill Celebrates 20 Years

Probedrill is extremely proud to be able to celebrate 20 years since its June 1995 inception. 

The company was originally founded by Brian and Helen Edwards and the first rig in use was
the RFW, which underwent a rebuild in 2008 and is still going strong today….

Original Probedrill Rig – RFW (1995)
RFW after Rebuild (2008)

Since 1995, Probedrill has progressively increased the size of its CPT Fleet and dramatically expanded the amount of testing services available.

As you can see below, one of the most interesting and impressive transformations has been our
7 tonne tracked rig.

Orinal Track Rig (1999)
Version 2 (2000)

Version 3 (2003)
Version 4 (2013)

Probedrill now has 3 truck rigs, 4 tracked rigs, a Marshbuggy rig, container rig and portable equipment that can be set up in various different locations/scenarios. With our range of rigs, CPT cones and specialty testing equipment, we are now a nationwide industry leader in providing site investigation services to many varied sites.

Probedrill recognises and acknowledges that without the valuable support of its loyal clients, the developments we have made over the last 20 years would not have been possible.

THANK YOU for your ongoing support and we look forward to continuing on to the next 20 years!

Probedrill News

  • Inclined CPTDecember 18, 2018
  • Information Flyer – TRUCK Rig UpdatesAugust 10, 2018
  • Information Flyer – September 2017September 28, 2017
  • Updated: 19 tonne tracked rig (M3) now East-Coast basedJanuary 31, 2017
  • Information Flyer – September 2016September 1, 2016
  • Information Flyer – March 2016April 7, 2016
  • Inclination on PlotsDecember 12, 2015
  • Tracked Rig based in Port HedlandDecember 12, 2015
  • Marshbuggy Rig – Spud legsOctober 27, 2015
  • Update on Electronic Plateload TestingAugust 27, 2015
  • GPS of locations now availableMay 3, 2015
  • Improvements to Vibrating Wire InstallationJuly 3, 2014
  • Plate Load TestingJuly 3, 2014
  • Information Flyer: Sediment/Piston Sampling, Vane Shear, “Floating” CPTJanuary 3, 2014

Latest Projects

  • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
  • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
  • South Australia: 2016
  • Seabed CPT: Gulf of St Vincent, S.A: 2016
  • Perth Stadium, Burswood: 2012 – 2015
  • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
  • Forrestfield – Airport Link Project, Perth: 2014 – 2015
  • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
  • Browse Phase 3 – James Price Point, Broome: 2012
  • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013

Keep up to date with our Geotechnical Equipment and Services over on SALTKICK

20_years

Probedrill is a member of the:
Australian Geomechanics Society

Get in touch…

Probedrill Office / Workshop

08 9417 9933 info@probedrill.com.au
Download TeamViewer Download TeamViewer
Probedrill Geotechnical Investigation © Copyright 2022 | site by digiflip