Probedrill Geotechnical Investigation

Geotechnical Investigation Western Australia, Site Assessment Services, Cone Penetration Testing - Probedrill, Perth, WA Western Australia

+61 8 9417 9933 info@probedrill.com.au
  • News
  • Gallery / Videos
  • Contact Us
Menu
  • Home
  • Geotechnical Services
    • Electric Friction Cone Penetration Testing (EFCP)/(CPT)
    • Piezocone Testing
    • Dissipation Testing
    • Seismic Cone Penetrometer Testing (SCPT)
    • Seismic Cone Penetrometer Testing (Dual Geophone) SCPT
    • Dilatometer Testing (DMT)
    • Seismic DMT (SDMT)
    • Standpipe installation
    • Soil Sampling
    • Piston Sampling
    • Dual Tube Sampling
    • Sediment Sampling
    • Electrical Vane Shear Testing
    • Vibrating Wire Piezometer Installation (VWP)
    • Electronic Plate Load Testing
    • Vacuum Potholing
    • Seabed CPT
    • Ball Penetrometer / T-Bar Penetrometer Testing
    • Water Sampling
    • MIP / ROST Environmental Testing
    • Resistivity / Conductivity Testing
    • Close
  • CPT Rigs
      • Seabed CPT
      • 22 Tonne Truck Rig (Merc)
      • 25 Tonne Truck Rig (RFW)
      • Morooka 1 (M1)
      • Morooka 2 (M2)
      • Morooka 3 (M3)
      • 13 tonne Marsh Buggy Rig
      • 7 tonne Track Rig
      • 22 tonne Track-Truck
      • Portable Equipment
      • 300kN Pushing frame
      • Container Rig
    • Close
  • Projects
    • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
    • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
    • South Australia: 2016
    • Seabed CPT: Gulf of St Vincent, S.A: 2016
    • Perth Stadium, Burswood: 2012 – 2015
    • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
    • Forrestfield – Airport Link Project, Perth: 2014 – 2015
    • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
    • Browse Phase 3 – James Price Point, Broome: 2012
    • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013
    • Perth – Bunbury Highway Project: 2007
    • Koolan Island: 2002
    • Close
  • Sub Sea Testing
  • Testing Details
    • What is Cone Penetration Testing (CPT)?
    • Methods of Testing
    • Equipment
    • Instrumentation
    • Graphs / Plots
    • Close
  • Seabed CPT

    Seabed CPT

  • 22 Tonne Truck Rig (Merc)

    22 Tonne Truck Rig (Merc)

  • 25 Tonne Truck Rig (RFW)

    25 Tonne Truck Rig (RFW)

  • Morooka 1 (M1)

    Morooka 1 (M1)

Home > Geotechnical Services > Dissipation Testing

Dissipation Testing

Dissipation testing can be conducted during a Pore Pressure test (CPTu) and is obtained by recording the value of pressure against time while the CPT test has been paused and the Cone is stationary.

As with a Dilatometer test (DMT), results from dissipation tests can be used to determine permeability and the coefficient of consolidation.

Our dissipation tests are plotted with the Pore Pressure (CPTu) results.  Click here to see an example of our Pore Pressure / Dissipation plots.


Projects using this service
Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
South Australia: 2016
Perth Stadium, Burswood: 2012 – 2015
Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
Forrestfield – Airport Link Project, Perth: 2014 – 2015
Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
Chevron Wheatstone LNG Project, Onslow: 2009 – 2013

Geotechnical Services

  • Electric Friction Cone Penetration Testing (EFCP)/(CPT)
  • Piezocone Testing
  • Dissipation Testing
  • Seismic Cone Penetrometer Testing (SCPT)
  • Seismic Cone Penetrometer Testing (Dual Geophone) SCPT
  • Dilatometer Testing (DMT)
  • Seismic DMT (SDMT)
  • Standpipe installation
  • Soil Sampling
  • Piston Sampling
  • Dual Tube Sampling
  • Sediment Sampling
  • Electrical Vane Shear Testing
  • Vibrating Wire Piezometer Installation (VWP)
  • Electronic Plate Load Testing
  • Vacuum Potholing
  • Seabed CPT
  • Ball Penetrometer / T-Bar Penetrometer Testing
  • Water Sampling
  • MIP / ROST Environmental Testing
  • Resistivity / Conductivity Testing

Probedrill News

  • Information Flyer – September 2017September 28, 2017
  • Updated: 19 tonne tracked rig (M3) now East-Coast basedJanuary 31, 2017
  • Information Flyer – September 2016September 1, 2016
  • Information Flyer – March 2016April 7, 2016
  • Inclination on PlotsDecember 12, 2015
  • Tracked Rig based in Port HedlandDecember 12, 2015
  • Marshbuggy Rig – Spud legsOctober 27, 2015
  • Update on Electronic Plateload TestingAugust 27, 2015
  • GPS of locations now availableMay 3, 2015
  • Probedrill Celebrates 20 YearsApril 3, 2015
  • Improvements to Vibrating Wire InstallationJuly 3, 2014
  • Plate Load TestingJuly 3, 2014
  • Information Flyer: Sediment/Piston Sampling, Vane Shear, “Floating” CPTJanuary 3, 2014

Latest Projects

  • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
  • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
  • South Australia: 2016
  • Seabed CPT: Gulf of St Vincent, S.A: 2016
  • Perth Stadium, Burswood: 2012 – 2015
  • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
  • Forrestfield – Airport Link Project, Perth: 2014 – 2015
  • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
  • Browse Phase 3 – James Price Point, Broome: 2012
  • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013

20_years

Probedrill is a member of the:
Australian Geomechanics Society

Download TeamViewer Download TeamViewer

Get in touch…

Probedrill Office / Workshop

08 9417 9933 info@probedrill.com.au
Probedrill Geotechnical Investigation © Copyright 2018 | site by digiflip
/* ----------------------------------------- */ /* Content Template: Rigs slider – slide - start */ /* ----------------------------------------- */ /* ----------------------------------------- */ /* Content Template: Rigs slider – slide - end */ /* ----------------------------------------- */ /* ----------------------------------------- */ /* Content Template: Services Template - start */ /* ----------------------------------------- */ /* ----------------------------------------- */ /* Content Template: Services Template - end */ /* ----------------------------------------- */