Probedrill Geotechnical Investigation

Geotechnical Investigation Western Australia, Site Assessment Services, Cone Penetration Testing - Probedrill, Perth, WA Western Australia

+61 8 9417 9933 info@probedrill.com.au
  • News
  • Gallery / Videos
  • Contact Us
Menu
  • Home
  • Geotechnical Services
    • Electric Friction Cone Penetration Testing (EFCP)/(CPT)
    • Piezocone Testing
    • Dissipation Testing
    • Seismic Cone Penetrometer Testing (SCPT)
    • Seismic Cone Penetrometer Testing (Dual Geophone) SCPT
    • Dilatometer Testing (DMT)
    • Seismic DMT (SDMT)
    • Standpipe installation
    • Soil Sampling
    • Piston Sampling
    • Dual Tube Sampling
    • Sediment Sampling
    • Electrical Vane Shear Testing
    • Vibrating Wire Piezometer Installation (VWP)
    • Electronic Plate Load Testing
    • Vacuum Potholing
    • Seabed CPT
    • Ball Penetrometer / T-Bar Penetrometer Testing
    • Water Sampling
    • MIP / ROST Environmental Testing
    • Resistivity / Conductivity Testing
    • Close
  • CPT Rigs
      • Seabed CPT
      • 22 Tonne Truck Rig (Merc)
      • 25 Tonne Truck Rig (RFW)
      • Morooka 1 (M1)
      • Morooka 2 (M2)
      • Morooka 3 (M3)
      • 13 tonne Marsh Buggy Rig
      • 7 tonne Track Rig
      • 22 tonne Track-Truck
      • Portable Equipment
      • 300kN Pushing frame
      • Container Rig
    • Close
  • Projects
    • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
    • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
    • South Australia: 2016
    • Seabed CPT: Gulf of St Vincent, S.A: 2016
    • Perth Stadium, Burswood: 2012 – 2015
    • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
    • Forrestfield – Airport Link Project, Perth: 2014 – 2015
    • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
    • Browse Phase 3 – James Price Point, Broome: 2012
    • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013
    • Perth – Bunbury Highway Project: 2007
    • Koolan Island: 2002
    • Close
  • Sub Sea Testing
  • Testing Details
    • What is Cone Penetration Testing (CPT)?
    • Methods of Testing
    • Equipment
    • Instrumentation
    • Graphs / Plots
    • Close
  • Seabed CPT

    Seabed CPT

  • 22 Tonne Truck Rig (Merc)

    22 Tonne Truck Rig (Merc)

  • 25 Tonne Truck Rig (RFW)

    25 Tonne Truck Rig (RFW)

  • Morooka 1 (M1)

    Morooka 1 (M1)

Home > Geotechnical News

Inclined CPT

December 18, 2018

We recently made modifications to our Portable CPT rig to be able to conduct inclined CPT … click here to find out more

Read more…

Information Flyer – TRUCK Rig Updates

August 10, 2018

Please click here to view our information flyer on recent improvements/upgrades made to our TRUCK rigs, including: New ‘FORWARD’ position on the Track-Truck Rig Increased Fast Up / Fast Down Speed on the MERC Truck Rig RFW Update  

Read more…

Information Flyer – September 2017

September 28, 2017

Please click here to view our September 2017 information flyer containing details on Additional Testing Services now provided by Probedrill: Probing at FAST or SLOW speed; Vacuum Potholing Please feel free to contact us should you require any further information.

Read more…

Updated: 19 tonne tracked rig (M3) now East-Coast based

January 31, 2017

Probedrill now has our 19 tonne tracked mounted CPT Rig (M3) based in the East Coast of Australia.  Please see the attached information flyer for more details. Update 31/1/17: Following a recently completed successful job, the M3 rig is now temporarily located in Adelaide.  Please contact us if you have any …

Read more…

Information Flyer – September 2016

September 1, 2016

Please click here  to view our September Information flyer containing details on Additional Testing Services provided by Probedrill, including: One & Two Geophone Seismic Testing Resistivity/Conductivity Cone Water Sampling

Read more…

Information Flyer – March 2016

April 7, 2016
Subsea CPT Rig

Click here to download our March information flyer, covering details on:our New Seabed CPT Pushing framenew websiteProbedrill 20 year celebrations

Read more…

Inclination on Plots

December 12, 2015

We now have the ability to plot the Inclination readings on our CPT graphs.Please advise the rig operator or office staff should you wish to have Inclination included on your plots. 

Read more…

Tracked Rig based in Port Hedland

December 12, 2015

We currently have our 11 tonne tracked mounted CPT Rig (M2) permanently based in Port Hedland.This means we can now provide reduced mob/demob costs for any North-West work.Please contact the office if you have any potential work in the area and are interested obtaining a quotation. 

Read more…

Marshbuggy Rig – Spud legs

October 27, 2015
April 15 - Probing on Swan River embankment

Improvements have been made to the capabilities of the Marshbuggy and we now have the ability to attach spud legs to the rig in order to provide increased stability and anchorage.In April 2015, we successfully conducted testing with the Marshbuggy in the Swan River using the spud leg attachments. Probing …

Read more…

Update on Electronic Plateload Testing

August 27, 2015
Plate Load Testing

We have recently performed several Electronic Plate Load tests around the Perth Metro area and would like to provide you with an update on our Plate Load Testing services and equipment available.Plate Load – SetupPlate Load Testing can be used to determine the strength characteristics of soil in situ by …

Read more…
  • 1
  • 2
  • Next Page »

Probedrill News

  • Inclined CPTDecember 18, 2018
  • Information Flyer – TRUCK Rig UpdatesAugust 10, 2018
  • Information Flyer – September 2017September 28, 2017
  • Updated: 19 tonne tracked rig (M3) now East-Coast basedJanuary 31, 2017
  • Information Flyer – September 2016September 1, 2016
  • Information Flyer – March 2016April 7, 2016
  • Inclination on PlotsDecember 12, 2015
  • Tracked Rig based in Port HedlandDecember 12, 2015
  • Marshbuggy Rig – Spud legsOctober 27, 2015
  • Update on Electronic Plateload TestingAugust 27, 2015
  • GPS of locations now availableMay 3, 2015
  • Probedrill Celebrates 20 YearsApril 3, 2015
  • Improvements to Vibrating Wire InstallationJuly 3, 2014
  • Plate Load TestingJuly 3, 2014
  • Information Flyer: Sediment/Piston Sampling, Vane Shear, “Floating” CPTJanuary 3, 2014

Latest Projects

  • Seabed CPT: Western Harbour Tunnel & Beaches Link Project (Sydney): May-June 2017
  • Updated: Marshbuggy with spud leg attachments – Swan River, Perth: 2015 & 2017
  • South Australia: 2016
  • Seabed CPT: Gulf of St Vincent, S.A: 2016
  • Perth Stadium, Burswood: 2012 – 2015
  • Elizabeth Quay (Perth Waterfront) Project: 2010 – 2015
  • Forrestfield – Airport Link Project, Perth: 2014 – 2015
  • Marshbuggy “Floating” CPT – Newcastle TSF, NSW: 2013
  • Browse Phase 3 – James Price Point, Broome: 2012
  • Chevron Wheatstone LNG Project, Onslow: 2009 – 2013

Keep up to date with our Geotechnical Equipment and Services over on SALTKICK

20_years

Probedrill is a member of the:
Australian Geomechanics Society

Get in touch…

Probedrill Office / Workshop

08 9417 9933 info@probedrill.com.au
Download TeamViewer Download TeamViewer
Probedrill Geotechnical Investigation © Copyright 2020 | site by digiflip